This morning I heard on the radio that the M25 was shut and traffic was diverting via the A1, so decided to avoid the area and use the M1. That ended up taking 1.5 hours.
Why do all the roadworks have to be done at once?
This morning I heard on the radio that the M25 was shut and traffic was diverting via the A1, so decided to avoid the area and use the M1. That ended up taking 1.5 hours.
Why do all the roadworks have to be done at once?